Project Type:Residential Aged Care Location:36-40 Graham Road, Highett Description of Works: Retention piling to site perimeter, basement excavation, capping beam, shotcrete walls and temporary ground anchors. External retaining walls and de-watering works. Client: Ryman Healthcare
MVRC – Stage A – South SP2
Project Type:Residential Apartments Location:2B McPherson Street, Moonee Ponds Description of Works: Demolition of existing site compound and soil remediation of site area. Retention system-D&C piling, basement excavation, capping beam, shotcrete walls and temporary ground anchors. In-ground footings works. Client: Camillo Builders
MVRC Stage B Apartments (Thomas Street)
Project Type:Residential Apartments Location:1 Thomas Street, Moonee Ponds Description of Works: Demolition of existing site compound and soil remediation of site area. Retention system-D&C piling, basement excavation, capping beam, shotcrete walls and temporary ground anchors. Foundation piling and in-ground footings works. Client: Camillo Builders
‘Highpark Seasons’ Glen Iris
Project Type:Residential Apartments Location:1559-1563 High Street, Glen Iris Description of Works: Complete demolition of existing buildings and soil remediation of site area. Retention system-D&C piling, basement excavation, capping beam, shotcrete walls and temporary ground anchors. Client: Camillo Builders
‘Penny Lane’ Moonee Ponds
Project Type:Residential Apartments / Commercial Location:17-23 Puckle Street & 6-14 Young Street, Moonee Ponds Description of Works: Complete demolition of existing buildings and soil remediation of site area. Dual buildings – Puckle Street and Young Street sites; Puckle Street Works – Retention system pile wall, basement bulk excavation, capping beam, shotcrete walls and temporary ground anchors. All in-ground foundation piling …
‘The Grounds Ivanhoe’
Project Type:Residential Apartments / Complex Location:The Boulevard, Ivanhoe East Description of Works: Construction of two major building (Buildings A + B) Retention system-D&C pile wall to both buildings, basement bulk excavation, capping beam + shotcrete walls. All in-ground foundation piling works + ground beams. Client: JW Land
FSH Dandenong
Project Type:Families Supportive Housing Location: 70 Cheltenham Road, Dandenong Description of Works: Site cut to fill and all in-ground footings and foundation piling works. Client: Camillo Builders
192-204 A’Beckett Street, Melbourne
Project Type:Student Accommodation Location:192-204 A’Beckett Street, Melbourne Description of Works: Retention system-D&C piling, basement excavation, capping beam, shotcrete walls and all in-ground footing and foundation works. Client: Crema Constructions
‘Eastern Eleven’ 11-29 Eastern Road, South Melbourne
Project Type:Commercial Office Building Location:11-29 Eastern Road, South Melbourne Description of Works: Soil remediation of the basement site area, followed by Retention system-D&C secant pile wall, basement bulk excavation (4 levels), capping beam, shotcrete walls, temporary ground anchors, completed with waterproofing membrane for a dry basement finish to the walls. All in-ground footings and foundation piling works. Client: Hacer Group …
2-4 Barenya Court, Kew
Project Type:Residential Apartments Location:2-4 Barenya Court, Kew Description of Works: Demolition of existing buildings and structures, followed by soil remediation of the site area. Retention system-D&C piling, basement excavation, capping beam, shotcrete walls and all in-ground footing and foundation works. Client: L.U. Simon Builders Pty Ltd